HIGHER MORWELL AVENUE PROJECT
We plan a paved walkway from the standing stone to the site of the pond. Two trees have been transplanted from the overcrowded bed beside the polytunnel and mostly rehoused shrubs put between them.
Page last updated 5 June 2017
The path will be the house side of the trees and shrubs and will be linked to the top of the steps that lead up from the path at ground level at the back of the house. The two trees, an amelanchier and an unidentified prunus variety, have taken well to their rather brighter surroundings although they have to now cope with more wind as this is an exposed area. The GWR railway bench will be placed at the pond end of the path so we can watch the frogs in comfort!